The challenge
Warm-season grass responds to changes in light and temperature. At Peace Stadium, the grounds team manages these conditions as natural light and weather change through the season.
How the team uses the lights
Grounds maintenance company Office Show works with Sodick FT. The team can position the two LED140 systems where the pitch needs extra light and adapt their placement as the turf conditions change.
What the example shows
Sodick Europe documented two LED140 units in use after an August fixture. The team can direct the rigs at the areas that need more light. Its report also highlights light distribution, moisture, airflow, temperature and timing as factors that inform day-to-day adjustments.
Two examples at one venue
Sodick Europe’s field report describes two LED140 rigs used on warm-season turf. Separately, Sodick FT’s LED55 brochure records a goalmouth demonstration at Peace Stadium. The examples show two different tasks at the same venue: delivering extra light to a zone and treating a smaller patch of wear.


